STREAM LIVE

Onalaksa Road Design Almost Complete

Onalaska City Engineer Jarrod Holter knows that Highway 16 will be shut down for two weeks later this month, and he says he sure wishes the construction near Farm and Fleet was a apart of that plan.

(Click for Audio)

He said the traffic study for the Highway 16 corridor in front of Blain’s Farm & Fleet is about 90% complete and should be ready for construction in the late summer.

In order to post comments, you must be a registered user.

Polls

Are You In Favor Of The Proposed Hwy 35 Changes?